Back to all resources

ACV de los Edificios de Katerra

Propósito de la investigación:

 

Analice los impactos ambientales de la cadena de suministro CLT de Katerra, así como su edificio Catalyst.

Acerca de

Katerra encargó el Carbon Leadership Forum (CLF) y Centro de Comercio Internacional de Productos Forestales (CINTRAFOR) at the University of Washington to analyze the environmental impacts of its CLT as well as the Catalyst Building in Spokane, Washington. The Catalyst is a 15,690 m2 (168,800 ft2), five-story office building that makes extensive use of CLT as a structural and design element. Jointly developed by Avista and McKinstry, Katerra largely designed and constructed the building, and used CLT produced by Katerra’s new factory.

Performing a life cycle assessment (LCA) on Katerra’s CLT will allow Katerra to explore opportunities for environmental impact reduction along their supply chain and improve their CLT production efficiency. Performing an LCA on the Catalyst Building will enable Katerra to better understand life cycle environmental impacts of mass timber buildings and identify opportunities to optimize the environmental performance of mid-rise CLT structures.  CINTRAFOR performed the LCA on Katerra’s CLT, and the CLF performed the LCA on the Catalyst Building.

Resultados

Se puede descargar un documento resumen y un informe completo del proyecto a la derecha.

Equipo de investigación

CLF

  • K. Simonen
  • M. Huang

CINTRAFOR

  • I. Ganguly
  • F. Pierobon
  • CX Chen

Expresiones de gratitud

The research team would like to thank Hans-Erik Blomgren of Katerra for his role in initiating this research study and fostering collaboration between Katerra and the University of Washington. This work was funded by Katerra.

View all policy resources in our resource library